The report and figures set out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Sutton Floodplain Risk Management Plan.
Sutton flood study report
Sutton flood study figures
The report and figures set out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Gundaroo Floodplain Risk Management Plan.
Gundaroo flood study report
Gundaroo flood study figures
The study defines the nature of both main stream flooding and major overland
flow at the villages of Murrumbateman, Bowning, Bookham and Binalong for flood frequencies
ranging between 20 and 0.2 per cent Annual Exceedance Probability (AEP), as well as for the
Probable Maximum Flood (PMF).
The Flood Study is the source of present day flooding conditions and will be used as the basis for
preparing the future Floodplain Risk Management Study and Plan.
*the reports have now been finalised, as attached, and are waiting for adoption by Council.
Murrumbateman, Bookham, Bowning and Binalong report
Murrumbateman, Bookham, Bowning and Binalong figures volume 2
Murrumbateman, Bookham, Bowning and Binalong figures volume 3